Bike trail and bridge over the canal and the river Vltava

The new wastewater treatment plant in Prague

Description of the Contract

Project documentation is design of bicycle paths as part of the construction of a new wastewater treatment plant in Prague 6 at Císařský ostrov island. Cycle path has a length of about 2.5 km and also includes a bridge structure that connects the island with the Prague 6, Podbabská street near the intersection with the street in Podbabě. The documentation was also the development of the architectural concept of the downstream area and resting places for cycling through spatial visualization.

Location

Prague 6

Activities realized

  • study
  • documentation for the construction land proceedings
  • visualizations preparation

Year

2007

Investor

The Capital of Prague