Extension of the A2 sanitary sewer

Description of the Contract

Construction of the sanitary sewer between the Do Koutů street in Modřany and the pump station in the Cholupice village. Considering the terrain segmentation, it is necessary to use for the designed connection of the Cholupice development drifted sections on gravitational pipelines to overcome the relevant terrain peaks. It concerns a sewer network of gravitational sanitary sewers in the total length of 5.7 km. Part of the sanitary sewers is realized in a cut-and cover excavation and part in driven drifts. Connection of the side drifts with signifi cant bottom exaggeration of the main sewer has been designed with well-hole shafts.

Location

Prague 12

Activities realized

  • documentation for the building proceedings
  • author supervision
  • realization documentation

Year

2012

Investor

The Capital of Prague