Urbanism

Reduction of the north-south arterial road traffic

Description of the Contract At the present time, the North-South arterial road is one of the busiest highways of the Capital of Prague, with all its negative and positive aspects of such a transportation structure which influence the City life. The situation is the more serious because the arterial road is routed crosswise the City center proper and it reaches the ... více

Bike trail and bridge over the canal and the river Vltava

The new wastewater treatment plant in Prague Description of the Contract Project documentation is design of bicycle paths as part of the construction of a new wastewater treatment plant in Prague 6 at Císařský ostrov island. Cycle path has a length of about 2.5 km and also includes a bridge structure that connects the island with the ... více

Defense Ministry Control and Management Center

Description of the Contract Volume and development study for the location of Defense Ministry Control and Management Center. The study has been done for three locations in order to select the most convenient variant for the construction of the Center in Prague. Contract included elaboration of complex audiovisual presentations of variants. The presentation incorporates content of ... více